Filter (0)
Dev Project Point (1)
Monitoring Station (2)
| Primary |
| Alternate |
| Impact Study |
| Special Investigation |
MS4 Outfall Monitoring Station (3)
Maintenance (4)
Cleanouts (5)
| El Cajon |
| Non-City |
Inlets (6)
| Catch Basin |
| Combination Grate and Curb |
| Curb Inlet |
| Grate Inlet |
| Non-City |
| Other |
Outlets (7)
| Curb |
| Storm Drain Outlet; Outfall; Overflow |
| Non-City |
Headwalls (8)
Gates (9)
| Ped Gate |
| Vehicle |
Conveyance System (10)
| El Cajon |
| Non-City |
Surface Conveyance (11)
| Alley Apron |
| Cross Gutter |
| Ribbon Gutter |
Surface Flow (12)
Stream (13)
Waterline (14)
Rivers (15)
Detention Basin (16)
Mu Catchment (17)
Post Construction BMP (18)
Waterbody (19)
Basin (20)
|